EPIC OF NEW FLARE SYSTEM

New Flare System

SGM was awarded new contract CFT1034 - EPIC of New Flare System at CPSF, Dragon oil facilities in Hazar, Turkmenistan.

The flare system is meant for safe disposal of combustible, toxic gases which are relieved from process plants and off sites during start-up, shutdown, normal operation, system depressurization or in case of an emergency.

Due to the requirement of installing an isolation valve on the existing flare header to isolate the flow to the existing flare and divert it to the new flare, the hot tap operation is envisaged to be a HOT TAP & STOPPLE operation without shutting down the flare system, which will be executed first time at CPSF area.

The project scope includes detail engineering, procurement, installation & commissioning activities for the New Flare System and Modification of existing Flare System and its associated components.

Project duration total is 30 months.

SGM appointed competent site team & subcontractors to execute this important project in compliance with the HSE requirements & Quality control.