Coiled Tubing

SGM Oilfield Services supplies all the key elements of a coiled tubing unit, including the reel, injector head, power pack, control cabin, high pressure pump unit and power hose reel. Company has experienced staff to satisfy client’s requirement. With this complete set, customers can perform a number of various significant jobs through the use of a single system.
This integrated approach allows our customers to acquire, rent or lease a customized and optimized system that fits their specific needs and requirements – all from a single source.

Coiled Tubing Services are including:

  • Coiled Tubing Fluids Pumping
  • Well clean-out
  • Acid Stimulation
  • Production string cleaning
  • Coiled tubing logging
  • Coiled Tubing Fishing and Milling
  • Kick off wells/nitrogen lifting
  • Drilling
  • Coiled tubing tools
  • Coiled Tubing Cementing through completion for zone abandonment
  1. Coiled Tubing unit with Tubing capacity – 5000m
  2. Control Cabin able for 3 person
  3. Coiled Tubing Injector & Work Platform
  4. Hydraulic Power Pack
  5. Work & Backup Reels
  6. 1¾” Work & Backup Coiled Tubing Strings

Snubbing

Snubbing is a process of performing heavy well intervention operations in a well by inserting tools when the back pressure or kick is being examined. It can be done in an existing well or in new well without the removal of the blowout preventer from the wellhead. Snubbing can only be carried out in a live well, i.e., when a well is not killed and is still under pressure.

SGM Oilfield Services is ready to provide equipment and experienced staff for the Snubbing operations.
Snubbing unit will be provided as per client’s request.
Today we have 2 available models as per table on right side.

Snubbing Unit Model 150 340
Number of cylinders 4 4
Cylinder diameter (in) 4.0 6.0
Piston rod diameter (in) 3.0 4.0
Effective lift area (in.2) 50.27 113.10
Lifting capacity at 3000 psi (lb) 150,796 339,292
Effective snub area (in.2) 21.99 62.83
Snubbing capacity at 3000 psi (lb) 65,973 188,496
Effective regenerated lift area (in.2) 28.27 50.27
Regenerated lift capacity at 3000 psi (lb) 84,810 150,810
Block speed down (fpm) 361 178
Block speed up (fpm) 281 223
Bore through unit (in) 8 11
Stroke (in) 116 116
Rotary torque (ft-lb) 1000 2800
Jack weight (lb) 5800 9600
Power unit weight (lb) 7875 8750

Well Hot Tap

Hot-tapping Process The tubular is nippled up to using either a saddle (tubulars) or welded connection (for low pressure). The system is filled with cutting fluid & pressure tested. The cutting bit is advanced and the wall is breached. Once a pressure change on the pressure gauge is witnessed, the cutting bit is reversed back into the hot-tapping housing and the isolating valve is closed. The operating or third-party company can then nipple up to valve & bleed off pressure or bull-head to re-gain pressure control through a fluid barrier.

SGM Oilfield Services Hot-tapping Capabilities

  • Tubular Tapping – 10Kpsi & 5Kpsi – 1”, 1 ½”, 2”, 2 3/8”, 2 7/8”, 3 ½”, 4”, 4 ½”, 5”
  • Bull Plug Tapping – 10Kpsi &5Kpsi – 2” w/Saddle – Modified saddles available
  • Casing Tapping - 5Kpsi – Chain saddle – 7”, 9-5/8”, 13-3/8”
  • Casing Tapping - 1Kpsi – Welded to any size casing – 2” nipple

Well Freeze

Freeze services are used for the creating a temporary barrier (ice plug) in order to maintain pressure control which is allowed safe mechanical repairs.
SGM Oilfield Services supplies with the freezing technology which is using Liquid Nitrogen together with special temperature monitors. Thereby costly fluid kills are eliminated and minimizing downtime.
With sufficient supplying Nitrogen and the proper monitoring freeze process accurately in real time, freeze plugs can be installed and maintained indefinitely in a safe and controlled condition.

  • Tubular Tapping – 10Kpsi & 5Kpsi – 1”, 1 ½”, 2”, 2 3/8”, 2 7/8”, 3 ½”, 4”, 4 ½”, 5”
  • Bull Plug Tapping – 10Kpsi &5Kpsi – 2” w/Saddle – Modified saddles available
  • Casing Tapping - 5Kpsi – Chain saddle – 7”, 9-5/8”, 13-3/8”
  • Casing Tapping - 1Kpsi – Welded to any size casing – 2” nipple

Well Freeze

Freezing Process The tubular or component is either wrapped with copper coil or a freeze cannister/jacket is installed. LN2 gas is then fed into the freezing system with the phase change in the LN2 permeates a temperature drop to the wrapped tubular or component, freezing the internal liquid. The formed internal ice plug, can then be pressure tested to confirm the integrity, allowing safe work to begin. After work is complete the ice plug is then thawed slowly, and normal operations can continue.

  • Tubular Tapping – 10Kpsi & 5Kpsi – 1”, 1 ½”, 2”, 2 3/8”, 2 7/8”, 3 ½”, 4”, 4 ½”, 5”
  • Bull Plug Tapping – 10Kpsi &5Kpsi – 2” w/Saddle – Modified saddles available
  • Casing Tapping - 5Kpsi – Chain saddle – 7”, 9-5/8”, 13-3/8”
  • Casing Tapping - 1Kpsi – Welded to any size casing – 2” nipple

Well Freeze

  • SGM Oilfield Services – Freezing Capabilities 
    • Tubular Freezing – Copper Coil Nitrogen Feed System 6” and Up
    • Valve Freezing – Copper Coil Nitrogen Feed System
    • Wellhead Freezing – Copper Coil Nitrogen Feed System
    • Tubular Freezing – Quick Wrap CO2 Feed System 1” to 8”
TOP